|
|||||||
Slewing System |
|||||||
---|---|---|---|---|---|---|---|
Click to enlarge |
Description
The arrangement depends on whether the crane is designed as a so-called hub crane, or whether the support of the boom, etc. takes place only through the column. The turntable cranes (see figure) assume the breakdown torque of the boom |
||||||
Linked items | |||||||
|
|||||||
Permanent links | |||||||
|
|||||||
Data provider | |||||||
|