|
|
|||||||
connecting rods |
|||||||
|---|---|---|---|---|---|---|---|
Premi per ingrandire
|
Description
The sketched connecting rod is first hung vertically on a cutting edge in A0 and enable vibration with small deflections. The resulting oscillation time T is measured. The analogous procedure for the cutting edge in Bo is the oscillation period TB. |
||||||
| Linked items | |||||||
|
|||||||
| Permanent links | |||||||
|
|
|||||||
| Data provider | |||||||
|
|
|||||||






