|
|||||||
Showing Action of Calhoun Cableway |
|||||||
---|---|---|---|---|---|---|---|
Click to enlarge |
Description
The Figure represents the skip being automatically filled, after being lowered at the correct angle into a heap of coal. It is hoisted by the hauling rope from either of the two |
||||||
Linked items | |||||||
|
|||||||
Permanent links | |||||||
|
|||||||
Data provider | |||||||
|