|
|||||||
Slewing system |
|||||||
---|---|---|---|---|---|---|---|
Click to enlarge |
Description
When the cranes no circular track and rollers, the carrier is fixedly connected to the crane column by two bearings as far apart as specified (see Figure) the overturning moment of the boom on appropriately arranged Support bearing and the vertical loads possibly be formed by a comb as a pin Tracking pins attached to the base to transfer the thrust bearing. |
||||||
Linked items | |||||||
|
|||||||
Permanent links | |||||||
|
|||||||
Data provider | |||||||
|