|
|||||||
Loading systems |
|||||||
---|---|---|---|---|---|---|---|
Click to enlarge |
Description
Fixed loading bridge of 80 m length with cab for cat bucket and grab operation, 8 to capacity, gas plant for Goerlitz. |
||||||
Linked items | |||||||
|
|||||||
Permanent links | |||||||
|
|||||||
Data provider | |||||||
|