|
|
|||||||
Loading systems |
|||||||
|---|---|---|---|---|---|---|---|
Premi per ingrandire
|
Description
Fixed loading bridge of 80 m length with cab for cat bucket and grab operation, 8 to capacity, gas plant for Goerlitz. |
||||||
| Linked items | |||||||
|
|||||||
| Permanent links | |||||||
|
|
|||||||
| Data provider | |||||||
|
|
|||||||






